//

IHM compliance: what Part I needs and how to keep it current

What the Hong Kong Convention and the EU Ship Recycling Regulation require of IHM Part I, which purchases need an MD and SDoC, and how to keep the inventory current through procurement.

IHM compliance means keeping a ship's Inventory of Hazardous Materials (IHM) accurate for its working life, as the Hong Kong Convention (HKC) and the EU Ship Recycling Regulation (EU SRR) require. Part I lists hazardous materials in the ship's structure and fixed equipment. It needs updating when equipment is added, removed or replaced with something different, so its evidence arrives through purchasing.

What is an IHM, and what do Parts I, II and III cover?

An Inventory of Hazardous Materials is a ship-specific record of the hazardous materials on board, their location and their approximate quantities. It is built and kept to the International Maritime Organization’s 2023 Guidelines for the development of the IHM, resolution MEPC.379(80). The inventory has three parts.

The three parts of an IHM

Part
What it covers
When it is needed

Part I

Materials in the ship’s structure and equipment

Throughout the ship’s life

Part II

Waste generated in operation

Before the ship is recycled

Part III

Stores

Before the ship is recycled

Part I, also written IHM Part 1, is the part that needs day-to-day attention. The guidelines say it should belong to the ship, and that its continuity should be confirmed when the flag, owner or operator changes.

The guidelines sort Part I materials into two lists. Table A covers materials whose installation is controlled: asbestos, polychlorinated biphenyls (PCBs), ozone-depleting substances and anti-fouling systems that contain organotin compounds or cybutryne. Table B covers nine more materials, including cadmium, hexavalent chromium, lead, mercury and radioactive substances. Most materials on both lists have a threshold concentration above which they must be declared; ozone-depleting and radioactive substances have none.

What does the Hong Kong Convention require?

The Hong Kong Convention, in force since 26 June 2025, requires every ship it covers to carry an IHM and hold an International Certificate on Inventory of Hazardous Materials (ICIHM), and to keep Part I up to date until the ship is recycled. New ships need both at delivery; existing ships have until 26 June 2030. Its full name is the Hong Kong International Convention for the Safe and Environmentally Sound Recycling of Ships, according to the IMO.

It applies to ships of 500 gross tonnage (GT) and above that fly the flag of a state party to the Convention. Ships that only ever operate in their own flag state’s waters, and warships or other state ships on non-commercial service, are outside it.

A ship under a non-party flag cannot be issued the certificate, but it is not exempt. The IMO’s guidance on the Convention tells port State control (PSC) officers, the inspectors who check foreign ships in port, to ask for documentation with the same information, supplemented by an IHM. Non-party ships get no more favourable treatment.

The dates and surveys that matter:

  • New ships need an approved IHM on board at delivery. Lloyd’s Register explains that a ship counts as new if its building contract is placed on or after 26 June 2025, in the absence of a building contract, its keel is laid on or after 26 December 2025, or it is delivered on or after 26 December 2027.

  • Existing ships must hold the ICIHM by 26 June 2030, unless the flag state says otherwise. DNV times the certificate to the ship’s first main class renewal survey between 26 June 2025 and 26 June 2030.

  • Surveys follow the certificate: an initial survey before it is issued, a renewal survey at intervals of no more than five years, and an additional survey the owner can request after a change, replacement or significant repair.

How does the EU Ship Recycling Regulation differ?

The EU Ship Recycling Regulation differs from the Hong Kong Convention in reach, in dates and in its list of materials. It applies to EU-flagged ships and to ships under any other flag that call at a port or anchorage in an EU member state. New EU-flagged ships need an IHM from delivery, existing ones have needed it since 31 December 2020, and both hold an inventory certificate. Ships under other flags have needed a statement of compliance, supplemented by an IHM, to call at EU ports since 31 December 2020.

The regulation, Regulation (EU) No 1257/2013, uses the same 500 GT threshold and similar exclusions. The two regimes stack rather than replace each other. Lloyd’s Register notes that HKC certification is in addition to any EU SRR certification, so one ship may need both.

The Hong Kong Convention and the EU SRR compared

Rule
Hong Kong Convention
EU SRR

Ships covered

Party-flagged ships, 500 GT and above

EU-flagged ships, and others calling at EU ports

New ships

IHM and ICIHM at delivery

IHM at delivery

Existing ships

ICIHM by 26 June 2030

IHM since 31 December 2020

Certificate

ICIHM

Inventory certificate (EU flag) or statement of compliance (other flags)

Extra materials on the list

None

PFOS (EU flag only) and HBCDD

Renewal survey

At most every five years

At most every five years

The hazardous materials lists differ in two places. The EU list adds perfluorooctane sulfonic acid (PFOS), which applies only to EU-flagged ships, and the brominated flame retardant HBCDD. DNV counts 15 substances under the EU SRR against 13 under the Convention.

Both regimes now cover cybutryne, an anti-fouling biocide controlled since 1 January 2023: the EU SRR through its reference to the anti-fouling rules, the 2023 Guidelines through Table A. A 2025 amendment, resolution MEPC.405(83), sets its threshold at 1,000 mg/kg or 200 mg/kg, depending on how the paint sample is taken.

Existing inventories do not need revising at once. Guidance from the European Commission and the European Maritime Safety Agency (EMSA) says cybutryne is included when maintenance next adds new materials to the inventory.

What happens if the IHM is out of date?

An out-of-date IHM is not, on its own, grounds for detaining a ship. Article 11(3) of the EU SRR says failure to update the inventory “shall not constitute a detainable deficiency”, and the IMO’s guidance on the Convention says the same. The consequences are real, but they sit elsewhere:

  • The certificate can lapse. Under EU SRR Article 10(2)(a), an inventory certificate ceases to be valid if Part I has not been properly maintained and updated to reflect changes in the ship’s structure and equipment.

  • The renewal survey tests Part I. Under the EU SRR, the renewal survey verifies that Part I meets the regulation’s requirements, so gaps in maintenance surface there.

  • Port inspections can go deeper. PSC officers start by checking that the certificate is on board. If there is no procedure on board for maintaining Part I, they can carry out a more detailed inspection. Inconsistencies in the inventory are reported to the flag state, to be corrected at the next survey.

  • A missing certificate is a different matter. Under the EU SRR, a ship that fails to produce a copy of its inventory certificate may be warned, detained, dismissed or excluded from EU ports.

Penalties for other breaches are set nationally. The EU SRR asks member states for penalties that are “effective, proportionate and dissuasive”, so there is no single fine to quote. The certificate is what gets checked. The maintenance is what keeps it valid.

What are MDs and SDoCs?

A Material Declaration (MD) and a Supplier’s Declaration of Conformity (SDoC) are the two documents a supplier provides to show whether a product contains IHM-listed hazardous materials. The MD declares what is in the product. The SDoC gives assurance that the MD was prepared to the guidelines’ requirements and names the entity responsible for it. Together, they are the evidence that keeps Part I accurate.

Under the 2023 Guidelines, an MD must state at least:

  • the date of the declaration and the MD identification number

  • the supplier’s name

  • the product name and product number

  • whether any Table A or Table B material is present above its threshold

  • the mass of each such material, where it is present above the threshold

An SDoC must include:

  • a unique identification number

  • the issuer’s name and contact address

  • identification of the product it covers

  • a statement of conformity

  • the date and place of issue

  • the signature, name and function of the person authorised to sign for the issuer

An SDoC stays valid for as long as the product is on board. Lloyd’s Register notes that one MD and SDoC can cover several units of the same equipment. The supplier can be a manufacturer, trader or agent. DNV says the supplier that sells the product prepares the forms, gathering material information from its own sub-suppliers.

Which purchases need an MD and SDoC?

Purchases that will be installed as fixed items in the ship’s structure or equipment need an MD and SDoC, because they go into Part I. Fixed means securely fitted in place, by welding, bolts, rivets or cement. Loose equipment, stores and everyday consumer goods do not go into Part I.

Where common purchases go in the IHM

Purchase
Goes into
MD and SDoC needed?

Machinery, pumps, valves and pipes fitted on board

Part I

Yes

Cables, gaskets and insulation

Part I

Yes

Paint applied to the hull or structure

Part I

Yes

Lead-acid batteries fixed in place

Part I

Yes

Spare parts held in stores

Part III, if they contain Table A or B materials

For the Part I update when fitted

Loose equipment

Part III, if it stays on board

Not for Part I

Computers, printers, lamps and other consumer goods

Part III

No

Identical replacement part or coating

No change to Part I

No Part I update

Some materials can be left out of the inventory altogether. Table B materials inherent in solid metals and alloys, such as steel, aluminium, brass and solder used in general construction, do not need listing. Nor do hazardous materials in the printed circuit boards inside electrical and electronic equipment.

Class societies and regulators disagree about items expected to contain no hazardous materials at all:

  • DNV says that even when a product contains none, suppliers must still prepare an MD and SDoC and owners must collect them.

  • Lloyd’s Register takes a similar line for anything that will or could become part of the ship’s structure or fitted equipment.

  • The Norwegian Maritime Authority, in a June 2020 circular for Norwegian-registered ships, said collecting MDs and SDoCs for every item, in every case, “cannot be regarded as an absolute requirement”. It also noted that neither the IMO nor the EMSA guidelines are mandatory under international law.

Who keeps the IHM up to date?

The shipowner designates a person to keep Part I up to date, either ashore or on board. DNV calls the role the IHM Designated Person (IHM DP). DNV also says the owner must have an IHM maintenance procedure built into its safety management system (SMS), and that the designated person should review every purchase made for each vessel on a fixed cycle, such as monthly or every two months.

Under the 2023 Guidelines, the designated person:

  • sets up and supervises a system that updates the inventory when new items are installed

  • keeps the inventory with the dates of changes and their own signature

  • provides the related documents for a survey or a sale of the ship

DNV also recommends keeping an audit log.

Part I needs an update when machinery or equipment is added, removed or replaced, or the hull coating is renewed, especially after a repair, conversion or sale. Installing identical parts or coatings needs no update. When the flag, owner or operator changes, confirm that the inventory carries over and still matches the ship. New entries use the current threshold values, even if the original inventory was built to older ones.

Why is maintaining IHM compliance harder than getting certified?

Certification is a project with an end date. Maintenance runs through purchasing for the life of the ship. In our experience, it also depends on suppliers who have little reason to prioritise documents once an order is delivered and paid.

Take an illustrative case: a replacement pump of a different model. The purchase order goes out because the vessel needs the pump at the next port. The pump is delivered, fitted and invoiced. Later, the designated person reviews the period’s purchases and asks the supplier for the MD and SDoC. The supplier has been paid and has moved on. The request joins a queue of reminders.

Three things make maintenance hard:

  1. Orders come first, documents later. Vessels need parts to keep running, so orders go out and compliance catches up afterwards. In our experience, the buyer’s leverage is gone once the supplier has been paid, so teams send reminders and escalate to collect a few missing documents, and surveyors find the gaps when they test the documentation trail.

  2. Tagging takes judgement. Tagging means marking which items need documents. Class societies interpret the requirements differently, and the rules leave room for judgement. In our experience, some teams tag everything to be safe and send suppliers requests that do not apply, and others tag too little and risk non-conformities at survey. Without a shared record of how similar items were classified before, each team decides again from the start.

  3. Suppliers repeat the same work. Suppliers tell us their biggest frustration is recreating the same forms for repeat orders. In our experience, they respond more readily when every request follows the same pattern.

In our view, none of this is negligence. It is a process problem: compliance added after the order, not built into it. Our earlier post, IHM compliance 2025: building reliable compliance without the administrative burden, makes this case in more detail.

How do you build IHM compliance into procurement?

You build IHM compliance into procurement by asking for documents while the buyer still has leverage: at the request for quotation (RFQ) and the purchase order. The steps below fit inside the marine procurement workflow you already run, not a separate compliance process.

  1. Put the requirement in your purchase order terms. DNV recommends writing the MD and SDoC requirement into your purchase order terms and conditions. Lloyd’s Register warns that a blanket line in a procurement policy, saying hazardous materials must be restricted, is not likely to be enough.

  2. Flag the lines at RFQ stage. Apply your tagging rule to each RFQ line, so the supplier knows which items need documents before quoting and can prepare them before delivery, not after.

  3. Ask for the documents with the order. Make the MD and SDoC part of what the supplier delivers, and check each MD against the minimum contents before you accept it.

  4. Keep one record per vessel. File each document against the order line and the vessel it went to, with dates, so the designated person can trace Part I entries back to the purchases behind them.

  5. Update Part I on installation. Spares that contain listed materials sit in Part III until they are fitted. Review purchases on a fixed cycle and update Part I when items go in.

  6. Check before the survey. Before each renewal survey, compare what is installed with what is documented, and close the gaps while the suppliers can still be reached.

IHM documents are one part of supplier compliance. Vetting, sanctions screening and payment checks are covered in our guide to procurement compliance in shipping.

How does ShipServ by Marcura support IHM compliance?

ShipServ by Marcura offers IHM as a Service inside its marine procurement platform, so the flagging, document requests and records described above sit on the order rather than in a separate inbox.

AI reads RFQ and purchase order lines and flags those that may contain hazardous materials. On an RFQ, the buyer and the supplier both see the flag before the supplier quotes. The supplier is asked for an MD and SDoC for each flagged line, and can reuse a document already uploaded. The flag prompts the supplier; it does not block quoting or confirming the order.

Buyers see dashboards of document status by order, supplier and vessel, so the designated person can see what is still outstanding. Marcura’s Control Tower, a back-office team, validates hazard classifications and approves or rejects suppliers’ requests to reclassify a line. An audit log records the actions buyers and suppliers take.

None of this replaces the judgement the regulations leave to people. The designated person still owns the inventory, the class society still decides at survey, and the tagging rule is still yours. What changes is when the request is made: at the RFQ and the order, while the supplier is still engaged.

A renewal survey is due at intervals of no more than five years. Part I can change with any new or different fixed equipment bought in between. That is why, in our view, IHM compliance is largely a procurement job.

FAQs

IHM documents, requested at the order

IHM documents, requested at the order

See how ShipServ by Marcura flags RFQ and purchase order lines that may contain hazardous materials and asks suppliers for MDs and SDoCs.

See how it works

Keep reading

Procurement compliance in shipping: from supplier to payment

Procurement compliance follows every order from requisition to payment. Approved suppliers, vetting, sanctions and KYB screening, invoice checks and payment controls each leave evidence, and the checklist shows what to keep.

Project cargo stevedoring costs: what a changed discharge sequence adds

How a project cargo voyage loses money in the gaps between estimate, invoice and claim, and where to catch it.

Before You fix: what towage fuel surcharges are telling us

Houston towage fuel surcharges are 3. 4 times last year’s level. Learn what to check before you fix.

Procurement compliance in shipping: from supplier to payment

Procurement compliance follows every order from requisition to payment. Approved suppliers, vetting, sanctions and KYB screening, invoice checks and payment controls each leave evidence, and the checklist shows what to keep.

Project cargo stevedoring costs: what a changed discharge sequence adds

How a project cargo voyage loses money in the gaps between estimate, invoice and claim, and where to catch it.